Tory chief whip Chris Heaton-Harris has asked the MP involved not to attend Parliament while the investigation is ongoing. Post navigation @it_is_rob @it_is_rob Thanks for your reply. The aim is for the bulk of the infrastructure works and improvements to be completed before the summer. However with all major schemes there follows secondary work to complete after the new road and layout is open. This vehicle was being driven in Ashford this afternoon. The driver had no insurance, an expired MOT since October 2021, no Vehicle Excise Duty since July 2021 and a tyre devoid of tread with cords exposed! The driver was reported to court and the vehicle seized