@Futur3isFemal3 This lane closure was set between 1525 and 1601 due to a lorry which suffered an off-side blowout. A tyre fitter attended and needed to be protected whilst the worked on the vehicle. The lane closure started to be removed at 1553, was clear at 1559 and the sign removed at 1601.